Click on links below to view
Staheli, K. and L. Maday. Geotechnical Baseline Reports - Applying the Guidelines to Microtunneling. No Dig 2009 March 29 - April 3, Toronto, Ontario Canada. NASTT Professional Paper.
Wetter, L., K. Staheli and P. Cohen. Trenchless Rehabilitation of a Trenchless Installation. No Dig 2009 March 29 - April 3, Toronto, Ontario Canada. NASTT Professional Paper.
Staheli, K and M. Ramos. Ballard Siphon Replacement Project. No Dig 2008 April 27-30, Dallas TX. NASTT Professional Paper.
Buer, E., M. Ramos and K. Staheli. New Waterline Requires Use of Multiple Trenchless Technologies. NASTT Northwest Journal, 2007. Pages 31-32
Staheli, K. Challenging Geotech and Differing Site Conditions, Microtunneling Seattle’s Green River Requiers Two Different Head Configurations. No Dig 2007 April 15-20, San Diego, CA. NASTT Professional Paper.
Staheli, K., M. Ramos. Willamette River Poses HDD Challenges. No Dig 2007 April 15-20, San Diego, CA. NASTT Professional Paper.
Hickey, M. and K. Staheli. Woods Trunk Sewer Replacement Project – A Challenging Trenchless Technology Case Study. No Dig 2007 April 15-20, San Diego, CA. NASTT Professional Paper.
Staheli, K., D. Frost, and M. Iscimen. Studies of Interface Friction Between Jacking Pipe Materials and Frictional Soils and the Impact on Jacking Forces. No Dig 2006 March 26-28, Nashville, TN. NASTT Professional Paper.
York, R., K. Staheli, K. Parker and A Shen. Trenchless Technology Provides a Unique and Unlikely Solution to Storm Water Issues at Sea-Tac International Airport. No Dig 2006 March 26-28, Nashville, TN. NASTT Professional Paper.
Staheli, K. and M. Wallin. Spending Dimes to Save Dollars: The Value of Specialized Construction Management on Large Trenchless Projects. No Dig 2005 April 24-27, Orlando FL. NASTT Professional Paper.
Harbin, B., M. Wallin, R. Bennett, K. Staheli. Starting off on the Wrong Foot – Problems with Microtunneling Shafts. No Dig 2005, April 24-27, Orlando FL. NASTT Professional Paper.
Staheli, K, and M. Hutchinson. Microtunneling, Claims, and Geotechnical Baseline Reports: Lessons Learned on the Tanner Creek Project. No Dig 2004, March 22-24, New Orleans, Louisiana. NASTT Professional Paper.
Nagle, G., S. DeCou, K. Staheli, Joel Nonnweiler. Crossing Sacramento’s Barge Canal Using Multiple Trenchless Technologies. No Dig 2004, March 22-24, New Orleans, LA. NASTT Professional Paper.
Burnam, J., K. Staheli, R. Solbrig, J. Hoggatt. 3rd Time’s the Charm: South Tahoe HDD Success Softens Bad Memories of Previous Failures. No Dig 2001, Nashville, TN. NASTT Professional Paper.
Staheli, K. and G. Duyvestyn. Snohomish River Crossing: Bring on the Boulders, Success on the Second Attempt. No Dig 2001, Nashville, TN. NASTT Professional Paper.
Staheli, K., G. Hermanson, P. Hopkins and C. Vandaelle. Inverted Siphon Installed from Alameda to Oakland Using HDD. No Dig 2000 April 9-12, Anaheim, CA. NASTT Professional Paper.
Staheli, K., D. Bennett, T. Hurley and H. O’Donnell. Installation of Pipelines Beneath Levees Using Horizontal Directional Drilling. Construction Productivity Advancement Research Program CPAR-GL-98-1 USACE Waterways Experiments Station. April, 1998.
Bennett, R. and K. Staheli. Controlled Field Tests of Retrievable Microtunneling System with Reaming Capabilities.USACE Technical Report CPAR-GL-96-2. 1996.
|